Road Rehabilitation
On Saturday, November 4, 2023 (weather permitting), asphalt paving is scheduled for Alta Loma Dr (from Gill to Cass St), Wilmarth Ave (from Alta Loma to Schulte), and Cass St (from Alta Loma to Fleming). This layer of asphalt being put down will complete all road paving operations for both streets. It is anticipated that the paving operation will be entirely completed on Saturday and residents will be allowed to access the roads again later in the day. Please be advised that residents of the noted streets will not be able to use their street during this work.
We kindly ask that residents of Alta Loma Dr (from Gill to Cass St), Wilmarth Ave (from Alta Loma to Schulte), and Cass St (from Alta Loma to Fleming) move all vehicles off of their street prior to 7 a.m. Saturday, Nov. 4 so that the contractor can complete the road paving without any interferences. We ask that you park any/all vehicles you may need to use on nearby streets that are not being paved during the day. Additionally, please do not move any leaves onto the street prior to Saturday, Nov. 4. The City asks that all leaves be raked to the curb, and not the street, during this time of year prior to the scheduled pick-up days.
Please keep children and pets away from all construction operations. Construction activities, and the associated equipment that goes with it, is attractive to small children and can be dangerous. Please keep children away from the equipment, removals, mass grading, underground utility installation, hot/fresh asphalt, and wet concrete. If you have any specific questions regarding the project, such as scheduling, parking, or access, please call the City Public Works Department at (248) 473-7250, Mr. Mike McNutt, Engineer for OHM at (313) 516-4735, or Mr. Austin Downie, Engineer for OHM at (734) 466-4437